x

Отправить ссылку

Отправьте своему другу ссылку на страницу


 
E-mail получателя*
Имя получателя
E-mail отправителя*
Имя отправителя
Ссылка*
 

* - Required fields

Array ( [ID] => 235721 [~ID] => 235721 [NAME] => FGC UES boosts the capacity of 220 kV Buzulukskaya substation feeding the west of the Orenburg Region by 1.5 times [~NAME] => FGC UES boosts the capacity of 220 kV Buzulukskaya substation feeding the west of the Orenburg Region by 1.5 times [IBLOCK_ID] => 36 [~IBLOCK_ID] => 36 [IBLOCK_SECTION_ID] => [~IBLOCK_SECTION_ID] => [DETAIL_TEXT] =>
FGC UES completed the reconstruction of 220 kV Buzulukskaya substation. The total cost of works amounted to RUB 650 million. As a result, the substation's capacity increased from 321.5 to 480 MVA. The project will result in more reliable power supply to Buzuluk city, the Orenburg Region, with a population of more than 85 thousand people, as well as to enterprises of the petroleum sector, in particular, Orenburgneft PJSC, a member of NK Rosneft. 

The facility’s devices for transmission of emergency and control signals (DTECS) for 220 kV power transmission lines to Sorochinskaya and Kuybyshev substations were upgraded in the final stage of the project. This allows to increase the speed of transmission of relay protection and automation (RP&A) commands, decrease the amount of inspection and equipment maintenance works to be carried out, reduce labor input required for maintenance. In addition, high-frequency treatment of 220 kV lines, an element of a centralized emergency control automation system, was replaced. 

The first stage of the reconstruction included replacement of two 125 kV autotransformers with modern analogs of 200 MVA capacity. 220 kV outdoor switchgear was rehabilitated, cross-connect equipment was updated. Six 110 kV oil circuit breakers and all 220 kV switches were replaced with SF6 switches. Such devices are compact, fireproof, environmentally friendly and designed for long service life (at least 25 years).
[~DETAIL_TEXT] =>
FGC UES completed the reconstruction of 220 kV Buzulukskaya substation. The total cost of works amounted to RUB 650 million. As a result, the substation's capacity increased from 321.5 to 480 MVA. The project will result in more reliable power supply to Buzuluk city, the Orenburg Region, with a population of more than 85 thousand people, as well as to enterprises of the petroleum sector, in particular, Orenburgneft PJSC, a member of NK Rosneft. 

The facility’s devices for transmission of emergency and control signals (DTECS) for 220 kV power transmission lines to Sorochinskaya and Kuybyshev substations were upgraded in the final stage of the project. This allows to increase the speed of transmission of relay protection and automation (RP&A) commands, decrease the amount of inspection and equipment maintenance works to be carried out, reduce labor input required for maintenance. In addition, high-frequency treatment of 220 kV lines, an element of a centralized emergency control automation system, was replaced. 

The first stage of the reconstruction included replacement of two 125 kV autotransformers with modern analogs of 200 MVA capacity. 220 kV outdoor switchgear was rehabilitated, cross-connect equipment was updated. Six 110 kV oil circuit breakers and all 220 kV switches were replaced with SF6 switches. Such devices are compact, fireproof, environmentally friendly and designed for long service life (at least 25 years).
[DETAIL_TEXT_TYPE] => html [~DETAIL_TEXT_TYPE] => html [PREVIEW_TEXT] => FGC UES completed the reconstruction of 220 kV Buzulukskaya substation. The total cost of works amounted to RUB 650 million. As a result, the substation's capacity increased from 321.5 to 480 MVA. The project will result in more reliable power supply to Buzuluk city, the Orenburg Region, with a population of more than 85 thousand people, as well as to enterprises of the petroleum sector, in particular, Orenburgneft PJSC, a member of NK Rosneft. [~PREVIEW_TEXT] => FGC UES completed the reconstruction of 220 kV Buzulukskaya substation. The total cost of works amounted to RUB 650 million. As a result, the substation's capacity increased from 321.5 to 480 MVA. The project will result in more reliable power supply to Buzuluk city, the Orenburg Region, with a population of more than 85 thousand people, as well as to enterprises of the petroleum sector, in particular, Orenburgneft PJSC, a member of NK Rosneft. [PREVIEW_TEXT_TYPE] => text [~PREVIEW_TEXT_TYPE] => text [DETAIL_PICTURE] => Array ( [ID] => 67326 [TIMESTAMP_X] => 04.02.2019 15:47:45 [MODULE_ID] => iblock [HEIGHT] => 336 [WIDTH] => 505 [FILE_SIZE] => 71267 [CONTENT_TYPE] => image/jpeg [SUBDIR] => iblock/14c [FILE_NAME] => 14cfc3386c16f45608511646813bedcd.jpg [ORIGINAL_NAME] => b.jpg [DESCRIPTION] => [OLD_FSK_ID] => [OLD_FSK_ID_ENG] => [HANDLER_ID] => [~src] => [SRC] => /upload/iblock/14c/14cfc3386c16f45608511646813bedcd.jpg ) [~DETAIL_PICTURE] => 67326 [ACTIVE_FROM] => 31.01.2019 [~ACTIVE_FROM] => 31.01.2019 [LIST_PAGE_URL] => /eng/public_relations/news/ [~LIST_PAGE_URL] => /eng/public_relations/news/ [DETAIL_PAGE_URL] => /eng/public_relations/news/?ELEMENT_ID=235721 [~DETAIL_PAGE_URL] => /eng/public_relations/news/?ELEMENT_ID=235721 [LANG_DIR] => /eng/ [~LANG_DIR] => /eng/ [CODE] => [~CODE] => [EXTERNAL_ID] => 235721 [~EXTERNAL_ID] => 235721 [IBLOCK_TYPE_ID] => news [~IBLOCK_TYPE_ID] => news [IBLOCK_CODE] => eng_news_company [~IBLOCK_CODE] => eng_news_company [IBLOCK_EXTERNAL_ID] => 36 [~IBLOCK_EXTERNAL_ID] => 36 [LID] => en [~LID] => en [NAV_RESULT] => [DISPLAY_ACTIVE_FROM] => 01/31/2019 [FIELDS] => Array ( ) [PROPERTIES] => Array ( [flag_main] => Array ( [ID] => 104 [TIMESTAMP_X] => 2019-02-21 12:46:52 [IBLOCK_ID] => 36 [NAME] => Main news [ACTIVE] => Y [SORT] => 500 [CODE] => flag_main [DEFAULT_VALUE] => [PROPERTY_TYPE] => L [ROW_COUNT] => 1 [COL_COUNT] => 30 [LIST_TYPE] => C [MULTIPLE] => N [XML_ID] => 104 [FILE_TYPE] => [MULTIPLE_CNT] => 5 [TMP_ID] => [LINK_IBLOCK_ID] => 0 [WITH_DESCRIPTION] => [SEARCHABLE] => N [FILTRABLE] => N [IS_REQUIRED] => N [VERSION] => 1 [USER_TYPE] => [USER_TYPE_SETTINGS] => [PROPERTY_VALUE_ID] => [VALUE] => [DESCRIPTION] => [VALUE_ENUM] => [VALUE_XML_ID] => [VALUE_ENUM_ID] => [~VALUE] => [~DESCRIPTION] => [~NAME] => Main news [~DEFAULT_VALUE] => ) [flag_region] => Array ( [ID] => 105 [TIMESTAMP_X] => 2019-02-21 12:46:52 [IBLOCK_ID] => 36 [NAME] => Region news [ACTIVE] => Y [SORT] => 500 [CODE] => flag_region [DEFAULT_VALUE] => [PROPERTY_TYPE] => L [ROW_COUNT] => 1 [COL_COUNT] => 30 [LIST_TYPE] => C [MULTIPLE] => N [XML_ID] => 105 [FILE_TYPE] => [MULTIPLE_CNT] => 5 [TMP_ID] => [LINK_IBLOCK_ID] => 0 [WITH_DESCRIPTION] => [SEARCHABLE] => N [FILTRABLE] => N [IS_REQUIRED] => N [VERSION] => 1 [USER_TYPE] => [USER_TYPE_SETTINGS] => [PROPERTY_VALUE_ID] => [VALUE] => [DESCRIPTION] => [VALUE_ENUM] => [VALUE_XML_ID] => [VALUE_ENUM_ID] => [~VALUE] => [~DESCRIPTION] => [~NAME] => Region news [~DEFAULT_VALUE] => ) [flag_investment] => Array ( [ID] => 106 [TIMESTAMP_X] => 2019-02-21 12:46:52 [IBLOCK_ID] => 36 [NAME] => Investment newa [ACTIVE] => Y [SORT] => 500 [CODE] => flag_investment [DEFAULT_VALUE] => [PROPERTY_TYPE] => L [ROW_COUNT] => 1 [COL_COUNT] => 30 [LIST_TYPE] => C [MULTIPLE] => N [XML_ID] => 106 [FILE_TYPE] => [MULTIPLE_CNT] => 5 [TMP_ID] => [LINK_IBLOCK_ID] => 0 [WITH_DESCRIPTION] => [SEARCHABLE] => N [FILTRABLE] => N [IS_REQUIRED] => N [VERSION] => 1 [USER_TYPE] => [USER_TYPE_SETTINGS] => [PROPERTY_VALUE_ID] => [VALUE] => [DESCRIPTION] => [VALUE_ENUM] => [VALUE_XML_ID] => [VALUE_ENUM_ID] => [~VALUE] => [~DESCRIPTION] => [~NAME] => Investment newa [~DEFAULT_VALUE] => ) [flag_ir_release] => Array ( [ID] => 107 [TIMESTAMP_X] => 2019-02-21 12:46:52 [IBLOCK_ID] => 36 [NAME] => IR release [ACTIVE] => Y [SORT] => 500 [CODE] => flag_ir_release [DEFAULT_VALUE] => [PROPERTY_TYPE] => L [ROW_COUNT] => 1 [COL_COUNT] => 30 [LIST_TYPE] => C [MULTIPLE] => N [XML_ID] => 107 [FILE_TYPE] => [MULTIPLE_CNT] => 5 [TMP_ID] => [LINK_IBLOCK_ID] => 0 [WITH_DESCRIPTION] => [SEARCHABLE] => N [FILTRABLE] => N [IS_REQUIRED] => N [VERSION] => 1 [USER_TYPE] => [USER_TYPE_SETTINGS] => [PROPERTY_VALUE_ID] => [VALUE] => [DESCRIPTION] => [VALUE_ENUM] => [VALUE_XML_ID] => [VALUE_ENUM_ID] => [~VALUE] => [~DESCRIPTION] => [~NAME] => IR release [~DEFAULT_VALUE] => ) [projects] => Array ( [ID] => 108 [TIMESTAMP_X] => 2019-02-21 12:46:52 [IBLOCK_ID] => 36 [NAME] => Projects [ACTIVE] => Y [SORT] => 500 [CODE] => projects [DEFAULT_VALUE] => [PROPERTY_TYPE] => G [ROW_COUNT] => 1 [COL_COUNT] => 30 [LIST_TYPE] => L [MULTIPLE] => N [XML_ID] => 108 [FILE_TYPE] => [MULTIPLE_CNT] => 5 [TMP_ID] => [LINK_IBLOCK_ID] => 0 [WITH_DESCRIPTION] => [SEARCHABLE] => N [FILTRABLE] => N [IS_REQUIRED] => N [VERSION] => 1 [USER_TYPE] => [USER_TYPE_SETTINGS] => [PROPERTY_VALUE_ID] => [VALUE] => [DESCRIPTION] => [VALUE_ENUM] => [VALUE_XML_ID] => [~VALUE] => [~DESCRIPTION] => [~NAME] => Projects [~DEFAULT_VALUE] => ) [mes] => Array ( [ID] => 109 [TIMESTAMP_X] => 2019-02-21 12:46:52 [IBLOCK_ID] => 36 [NAME] => MES [ACTIVE] => Y [SORT] => 500 [CODE] => mes [DEFAULT_VALUE] => [PROPERTY_TYPE] => G [ROW_COUNT] => 1 [COL_COUNT] => 30 [LIST_TYPE] => L [MULTIPLE] => Y [XML_ID] => 109 [FILE_TYPE] => [MULTIPLE_CNT] => 5 [TMP_ID] => [LINK_IBLOCK_ID] => 73 [WITH_DESCRIPTION] => [SEARCHABLE] => N [FILTRABLE] => N [IS_REQUIRED] => N [VERSION] => 1 [USER_TYPE] => [USER_TYPE_SETTINGS] => [PROPERTY_VALUE_ID] => [VALUE] => [DESCRIPTION] => [VALUE_ENUM] => [VALUE_XML_ID] => [~VALUE] => [~DESCRIPTION] => [~NAME] => MES [~DEFAULT_VALUE] => ) [mes_show_contacts] => Array ( [ID] => 110 [TIMESTAMP_X] => 2019-02-21 12:46:52 [IBLOCK_ID] => 36 [NAME] => Show MES contacts [ACTIVE] => Y [SORT] => 500 [CODE] => mes_show_contacts [DEFAULT_VALUE] => [PROPERTY_TYPE] => L [ROW_COUNT] => 1 [COL_COUNT] => 30 [LIST_TYPE] => L [MULTIPLE] => N [XML_ID] => 110 [FILE_TYPE] => [MULTIPLE_CNT] => 5 [TMP_ID] => [LINK_IBLOCK_ID] => 0 [WITH_DESCRIPTION] => [SEARCHABLE] => N [FILTRABLE] => N [IS_REQUIRED] => N [VERSION] => 1 [USER_TYPE] => [USER_TYPE_SETTINGS] => [PROPERTY_VALUE_ID] => 199234 [VALUE] => Yes [DESCRIPTION] => [VALUE_ENUM] => Yes [VALUE_XML_ID] => true [VALUE_ENUM_ID] => 47 [~VALUE] => Yes [~DESCRIPTION] => [~NAME] => Show MES contacts [~DEFAULT_VALUE] => ) [photo_gallery_id] => Array ( [ID] => 111 [TIMESTAMP_X] => 2019-02-21 12:46:52 [IBLOCK_ID] => 36 [NAME] => Photoalbum [ACTIVE] => Y [SORT] => 500 [CODE] => photo_gallery_id [DEFAULT_VALUE] => [PROPERTY_TYPE] => S [ROW_COUNT] => 1 [COL_COUNT] => 30 [LIST_TYPE] => L [MULTIPLE] => N [XML_ID] => 111 [FILE_TYPE] => [MULTIPLE_CNT] => 5 [TMP_ID] => [LINK_IBLOCK_ID] => 0 [WITH_DESCRIPTION] => [SEARCHABLE] => N [FILTRABLE] => N [IS_REQUIRED] => N [VERSION] => 1 [USER_TYPE] => [USER_TYPE_SETTINGS] => [PROPERTY_VALUE_ID] => [VALUE] => [DESCRIPTION] => [VALUE_ENUM] => [VALUE_XML_ID] => [~VALUE] => [~DESCRIPTION] => [~NAME] => Photoalbum [~DEFAULT_VALUE] => ) [photo_gallery_items] => Array ( [ID] => 112 [TIMESTAMP_X] => 2019-02-21 12:46:52 [IBLOCK_ID] => 36 [NAME] => Photo [ACTIVE] => Y [SORT] => 500 [CODE] => photo_gallery_items [DEFAULT_VALUE] => [PROPERTY_TYPE] => E [ROW_COUNT] => 1 [COL_COUNT] => 30 [LIST_TYPE] => L [MULTIPLE] => N [XML_ID] => 112 [FILE_TYPE] => [MULTIPLE_CNT] => 5 [TMP_ID] => [LINK_IBLOCK_ID] => 0 [WITH_DESCRIPTION] => [SEARCHABLE] => N [FILTRABLE] => N [IS_REQUIRED] => N [VERSION] => 1 [USER_TYPE] => [USER_TYPE_SETTINGS] => [PROPERTY_VALUE_ID] => [VALUE] => [DESCRIPTION] => [VALUE_ENUM] => [VALUE_XML_ID] => [~VALUE] => [~DESCRIPTION] => [~NAME] => Photo [~DEFAULT_VALUE] => ) ) [DISPLAY_PROPERTIES] => Array ( ) [IBLOCK] => Array ( [ID] => 36 [~ID] => 36 [TIMESTAMP_X] => 21.02.2019 12:46:52 [~TIMESTAMP_X] => 21.02.2019 12:46:52 [IBLOCK_TYPE_ID] => news [~IBLOCK_TYPE_ID] => news [LID] => en [~LID] => en [CODE] => eng_news_company [~CODE] => eng_news_company [NAME] => News [~NAME] => News [ACTIVE] => Y [~ACTIVE] => Y [SORT] => 500 [~SORT] => 500 [LIST_PAGE_URL] => /eng/public_relations/news/?ID=36 [~LIST_PAGE_URL] => /eng/public_relations/news/?ID=36 [DETAIL_PAGE_URL] => #SITE_DIR#/public_relations/news/?ELEMENT_ID=#ID# [~DETAIL_PAGE_URL] => #SITE_DIR#/public_relations/news/?ELEMENT_ID=#ID# [SECTION_PAGE_URL] => #SITE_DIR#/public_relations/news/?SECTION_ID=#ID# [~SECTION_PAGE_URL] => #SITE_DIR#/public_relations/news/?SECTION_ID=#ID# [PICTURE] => [~PICTURE] => [DESCRIPTION] => [~DESCRIPTION] => [DESCRIPTION_TYPE] => text [~DESCRIPTION_TYPE] => text [RSS_TTL] => 24 [~RSS_TTL] => 24 [RSS_ACTIVE] => N [~RSS_ACTIVE] => N [RSS_FILE_ACTIVE] => N [~RSS_FILE_ACTIVE] => N [RSS_FILE_LIMIT] => 10 [~RSS_FILE_LIMIT] => 10 [RSS_FILE_DAYS] => 7 [~RSS_FILE_DAYS] => 7 [RSS_YANDEX_ACTIVE] => N [~RSS_YANDEX_ACTIVE] => N [XML_ID] => 36 [~XML_ID] => 36 [TMP_ID] => [~TMP_ID] => [INDEX_ELEMENT] => Y [~INDEX_ELEMENT] => Y [INDEX_SECTION] => Y [~INDEX_SECTION] => Y [WORKFLOW] => Y [~WORKFLOW] => Y [BIZPROC] => N [~BIZPROC] => N [SECTION_CHOOSER] => L [~SECTION_CHOOSER] => L [LIST_MODE] => [~LIST_MODE] => [VERSION] => 1 [~VERSION] => 1 [LAST_CONV_ELEMENT] => 0 [~LAST_CONV_ELEMENT] => 0 [SOCNET_GROUP_ID] => [~SOCNET_GROUP_ID] => [EDIT_FILE_BEFORE] => [~EDIT_FILE_BEFORE] => [EDIT_FILE_AFTER] => [~EDIT_FILE_AFTER] => [SECTIONS_NAME] => Разделы [~SECTIONS_NAME] => Разделы [SECTION_NAME] => Раздел [~SECTION_NAME] => Раздел [ELEMENTS_NAME] => Элементы [~ELEMENTS_NAME] => Элементы [ELEMENT_NAME] => Элемент [~ELEMENT_NAME] => Элемент [RIGHTS_MODE] => [~RIGHTS_MODE] => [EXTERNAL_ID] => 36 [~EXTERNAL_ID] => 36 [LANG_DIR] => /eng/ [~LANG_DIR] => /eng/ [SERVER_NAME] => www.fsk-ees.ru [~SERVER_NAME] => www.fsk-ees.ru ) [SECTION] => Array ( [PATH] => Array ( ) ) [SECTION_URL] => )

FGC UES boosts the capacity of 220 kV Buzulukskaya substation feeding the west of the Orenburg Region by 1.5 times

01/31/2019 FGC UES boosts the capacity of 220 kV Buzulukskaya substation feeding the west of the Orenburg Region by 1.5 times
FGC UES completed the reconstruction of 220 kV Buzulukskaya substation. The total cost of works amounted to RUB 650 million. As a result, the substation's capacity increased from 321.5 to 480 MVA. The project will result in more reliable power supply to Buzuluk city, the Orenburg Region, with a population of more than 85 thousand people, as well as to enterprises of the petroleum sector, in particular, Orenburgneft PJSC, a member of NK Rosneft. 

The facility’s devices for transmission of emergency and control signals (DTECS) for 220 kV power transmission lines to Sorochinskaya and Kuybyshev substations were upgraded in the final stage of the project. This allows to increase the speed of transmission of relay protection and automation (RP&A) commands, decrease the amount of inspection and equipment maintenance works to be carried out, reduce labor input required for maintenance. In addition, high-frequency treatment of 220 kV lines, an element of a centralized emergency control automation system, was replaced. 

The first stage of the reconstruction included replacement of two 125 kV autotransformers with modern analogs of 200 MVA capacity. 220 kV outdoor switchgear was rehabilitated, cross-connect equipment was updated. Six 110 kV oil circuit breakers and all 220 kV switches were replaced with SF6 switches. Such devices are compact, fireproof, environmentally friendly and designed for long service life (at least 25 years).

Back to the list